by Michael MacDonald Michael MacDonald

Drill Waste Management for Gas Distribution Upgrade

Drill Waste Management for Gas Distribution Upgrade

In 2015, a major Canadian natural gas distribution company had to perform construction operations to upgrade its existing distribution system. To mitigate the disturbance of the surface level roads and natural habitats, the proponent utilized horizontal directional drilling (HDD) technology. Twenty large bores (36" and 42") were planned for this project.

by Michael MacDonald Michael MacDonald

Enbridge Gas Distribution Pipeline Project

The Georgian Bay Pipeline Project was necessary to meet growing need for natural gas in that region. The new pipeline was 20 kilometers and 12” diameter. The route for the pipe included 30 road, rail and river crossings which would require horizontal directional drilling (HDD) to complete. Spent HDD fluids and cuttings are a regulated waste in Ontario and very costly to transport and dispose of. An estimated 250,000 gallons (940,000 litres) of spent drill mud would be in need of disposal.

by Michael MacDonald Michael MacDonald

Drilling Waste in Quebec

Drilling Waste in Quebec

Driller for major gas distributor requires cost effective solution for disposing of drilling waste in Quebec near Pierre Elliott Trudeau International Airport. The drill site was in an urban setting with high traffic volume. Drill spoils waste was too liquid and would not be accepted by local disposal site.

by Michael MacDonald Michael MacDonald

Drilling waste BC

Drilling waste in BC in need of solidification at remote mountain top site. Drilling mud produced near slopes estimated at greater than 28⁰ restricting mobility and truck access. Project deadline was constrained by heavy rain prior to mobilization and wildlife migration and fisheries preservation. Thin layers of gravel-like natural soil provided inadequate soil properties for mix-bury-cover site processing.